FAQS
Base Models (Emergency Shelter / Safe Room) Starting at $60,000 – $144,000 Compact, secure solutions for families or individuals Includes reinforced concrete structure, secure entry, ventilation, and basic power and water connections
Mid-Tier Custom Bunkers (Partial Off-Grid Capability) $180,000 – $720,000 Designed for 1–4 weeks of independent living Includes multiple rooms, NBC air filtration, backup solar, plumbing, and essential storage
Premium Bespoke Bunkers (Fully Off-Grid / Luxury Finishes) $720,000 – $12.M+ Fully self-sustaining underground homes with luxury interiors Advanced climate control, high-end appliances, security systems, water purification, long-term provisions, and optional wellness features (e.g. gym, media room, spa)
Custom quotes are provided after a site assessment and design consultation. All pricing includes project management, compliance with safety standards, and final system testing.
The average timeline for a custom bunker project ranges from 3 to 9 months, depending on your specific requirements:
Design & Planning: 4–6 weeks Site analysis, structural engineering, permits, and custom design specifications.
Excavation & Structural Build: 6–12 weeks Includes digging, pouring foundations, reinforced walls, and entry systems.
Interior Fit-Out & Systems Installation: 6–10 weeks Electrical, plumbing, air filtration (e.g., NBC systems), security systems, and custom interior finishes. Final Testing & Handover: 1–2 weeks System testing, safety checks, and client walkthrough. For more advanced or fully off-grid facilities (e.g. water purification, solar power, food storage, luxury finishes), the timeline may extend closer to 9–12 months.
Ready to Get Started? Building your custom bunker begins with a simple, secure process designed around your needs, your property, and your peace of mind. Here’s how it works:
1. Initial Consultation (Free) Schedule a no-obligation call with our team to discuss your goals, timeline, and budget. We’ll answer your questions and help determine the right solution for you.
2. Site Assessment & Feasibility Study Our engineers will evaluate your location, soil conditions, zoning regulations, and access points. This helps us design a structure that works with your environment—not against it.
3. Custom Design & Quote You’ll receive detailed design plans, timeline estimates, and a transparent quote tailored to your specifications. Revisions are welcome—we build around you.
4. Construction & Installation Once approved, our expert team begins excavation and building, keeping you informed at every stage. Typical builds take 3–9 months, depending on complexity.
5. Final Walkthrough & Support We test every system thoroughly and walk you through operation, safety features, and maintenance.
Long-term support plans are available for continued peace of mind.